24
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Batch-scheduling problems through the flowshop with both receiving and delivery just in time

&
Pages 1943-1955 | Received 01 Jul 1992, Published online: 15 May 2007
 

Abstract

In scheduling literature, the flowshop problem is usually concerned only with finding a processing order of jobs on each machine. However, this paper addresses flowshop batch-scheduling problems, that is, to determine batch sizes of parts with a common due date, and to schedule the resulting batches. We propose an objective for the problems that not only minimizes inventory but also provides for receiving material just in time and delivery just in time. A heuristic method to solve the problem is proposed. An example is also provided to show how the proposed method works.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.