Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times

&
Pages 1243-1263 | Received 01 Apr 1993, Published online: 07 May 2007
 

Abstract

We present a family of rolling horizon heuristics to minimize maximum lateness on a single machine in the presence of sequence-dependent setup times. This problem occurs as a subproblem in a decomposition procedure for more complicated job shop scheduling problems. The procedures solve a sequence of subproblems to optimality with a branch and bound algorithm and implements only part of the solution obtained. The size and number of the subproblems are controlled by algorithm parameters. Extensive computational experiments show that these procedures outperform myopic dispatching rules by an order of magnitude, both on average and in the worst case, in very reasonable computation times.

Additional information

Notes on contributors

R. UZSOY

To whom correspondence should be addressed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.