119
Views
27
CrossRef citations to date
0
Altmetric
Original Articles

A hybrid modelling approach to the design of an AGV-based material handling system for an FMS

&
Pages 2015-2030 | Received 01 Aug 1993, Published online: 16 May 2007
 

Abstract

The problem of organizing and controlling the material handling activity in an AGV-based material handling system for a flexible manufacturing system involves several decisions such as the number of vehicles required for the system, the layout of the tracks, the dispatching rules for the vehicles and the provision of control zones and buffers. This paper demonstrates the use of a two-stage approach for solving the problem. The required number of vehicles is estimated using an analytical model in the first stage. In the next stage, the effects of AGV failures and AGV dispatching rules on the system performance are observed through simulation studies based on which the AGV dispatching rule can be chosen.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.