Modelling the load levelling problem in master production scheduling for MRP systems

&
Pages 483-493 | Published online: 25 Jun 2007
 

SUMMARY

When infeasible master production schedules (MPS) are detected during the rough-cut capacity planning phase, material requirements planning (MRP) systems rely on the user's expertise to solve this problem. The usual procedure is to shift production either earlier or later in the planning horizon or to increase the capacity at some work centres during given periods of time. The main challenge is to identify what the best changes are in order to maintain a reasonable load profile across all work centres. In this paper we develop optimization models to support the scheduler's task of resolving capacity infeasibilities. The models take into consideration a variety of costs and manufacturing characteristics to provide the scheduler with maximum flexibility. In an extension to the basic model, the scheduler is also able to control the degree of difference between a proposed schedule and the original MPS.

Additional information

Notes on contributors

B. ADENSO-DÍAZ

To whom correspondence should be addressed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.