Scheduling multi-purpose batch plants with junction constraints

, , &
Pages 525-541 | Published online: 25 Jun 2007
 

SUMMARY

There is an increasing trend in the chemical process industry to operate flexible batch plants because of their capability to manufacture multiple products simultaneously by sharing the same process resources. In this paper, the scheduling of multi-purpose batch chemical plants with junction (header) constraints is considered. A mixed-integer non-linear model for the scheduling of multi-purpose batch chemical plants is formulated that considers the connection between equipment sets, transfer times, variable batch sizes, alternative process plans, and batch merging. Because of the computational time complexity of the batch scheduling problem, a heuristic scheduling algorithm that minimizes the total tardiness is developed lo solve the model.

Additional information

Notes on contributors

M. M. DESSOUKY

To whom correspondence should be addressed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.