221
Views
32
CrossRef citations to date
0
Altmetric
Original Articles

Lot size reorder point inventory model with controllable lead time and set-up cost

Pages 635-642 | Published online: 26 Nov 2010
 

This paper deals with the lead time and set-up cost reductions problem on the modified lot size reorder point inventory model in which the production process is imperfect. We consider that the lead time can be shortened at an extra crashing cost, which depends on the length of lead time to be reduced and the ordering lot size. The option of investing in reducing set-up cost is also included. Two commonly used investment cost functional forms, logarithmic and power, are employed for set-up cost reduction. We assume that the stochastic demand during lead time follows a Normal distribution. The objective is simultaneously to optimize the lot size, reorder point, set-up cost and lead time. An algorithm of finding the optimal solution is developed, and two numerical examples are given to illustrate the results.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.