An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length

, , &
Pages 1051-1061 | Received 28 Apr 2008, Accepted 07 Apr 2009, Published online: 23 Oct 2009
 

Abstract

This article develops an integrated model in considering the situations of an imperfect process with imperfect maintenance and inspection time for the joint determination of both economic production quantity (EPQ) and preventive maintenance (PM). This imperfect process has a general deterioration distribution with increasing hazard rate. Even with periodic PM, such a production system cannot be recovered as good as new. This means that the system condition depends on how long it runs. Also, the PM level can be distinct due to the maintenance cost. For convenience, it is assumed the age of system is reduced in proportional to the PM level. Further, during a production cycle, we need an inspection to see if the process is in control. This inspection might demand a considerable amount of time. In this article, we take PM level and inspection time into consideration to optimise EPQ with two types of out-of-control states. To see how the method works, we use a Weibull shock model to show the optimal solutions for the least costs.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.