Abstract
The problem of coping with inspector error when the inspector error rate is unknown is addressed in this paper. Currently no methods to analyze this problem have appeared in the literature. The results of this research indicate that some plans are definitely superior to others in controlling a specified overall deviation from the design requirements.
Additional information
Notes on contributors
Boubekeur Rahali
Mr. Rahali is a Ph.D. candidate in the School of Industrial Engineering.
B. L. Foote
Dr. Foote is a Professor in the School of Industrial Engineering.