Publication Cover
Journal of Quality Technology
A Quarterly Journal of Methods, Applications and Related Topics
Volume 32, 2000 - Issue 4
235
Views
119
CrossRef citations to date
0
Altmetric
Articles

Two Alternatives to the Shewhart Control Chart

Pages 427-431 | Published online: 20 Feb 2018
 

Abstract

Average run length (ARL) values are calculated for two control chart schemes and compared with those of a standard Shewhart chart. Both control charts are based on runs rules and are easily implemented. An out-of-control condition for one of the charts is a run of two of two successive points beyond a special control limit. The other chart uses a run of two of three successive points beyond a different control limit. Both schemes are shown to have better, that is, lower, ARL values than the standard Shewhart chart for process average shifts as large as 2.6 standard deviations from the mean.

Additional information

Notes on contributors

Morton Klein

Dr. Klein is a Professor in the Department of Industrial Engineering and Operations Research. He is a Member of ASQ. His email address is [email protected].

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.