Abstract
We investigate periodic replacement policies with minimal repair at failure, minimizing the average expected cost per unit time span. Together with the stranded costs c1 and c2 of repair and planned relpacement respectively, we introduce in this paper a general cost function increasing continously with the length of time a unit is in use