121
Views
2
CrossRef citations to date
0
Altmetric
Research Article

Heat integration and cyclic scheduling of multipurpose batch plants using three index unit-specific event based model

&
 

Abstract

Process scheduling with a long time horizon always leads to large problem size, which is challenging to solve for global optimal solutions. The problem complexity further increases with the inclusion of additional tasks such as heat integration, water integration, material transfers and shared storage. Cyclic scheduling can be a potential option to handle the long time horizon scheduling problems. In this work, a novel unified three index unit-specific event-based mathematical formulation is presented for cyclic scheduling of multipurpose batch plants. The unified framework reduces to a simple case in the absence of cyclic scheduling. The task extending to the next cycle is integrated with the short term scheduling constraints using the active task concept. Further, the framework is also extended for simultaneous cyclic scheduling and heat integration of multipurpose batch plants. The computational performance of the unified framework is evaluated with benchmark examples taken from the literature.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.