Construction time information system for the building industry

Pages 489-509 | Published online: 28 Jul 2006
 

Abstract

The paper describes a computerized construction time information system for time planning of buildings at early stages of design. A sample of 29 commercial, privately funded buildings was used to develop the proposed model. A procedure for extending the model to other project categories is shown. Multiple linear regression analysis of sample data shows that the durations of activity groups: substructure,superstructure, cladding, finishes, services and their sequential start – start lag times can be predicted from 12 variables: grossjloor area, area of groundpoor, approximate excavated volume, building height,number of storeys, end use, cladding type, presence of atrium, building location, intensity of services and site accessibility. An experiment involving nine planners and three office projects showed that the time predictions of the model fall within the distribution of planners' estimates and are tatistically indistinguishable from them. Therefore, the model can produce reliable estimates of construction times.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.