71
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Determination of Filter Pore Size for Use in HB Line Phase II Production of Plutonium Oxide

, &
Pages 2798-2802 | Received 13 Nov 2014, Accepted 18 Aug 2015, Published online: 08 Jan 2016
 

Abstract

The Savannah River Site’s H-Canyon and HB-Line are tasked with the production of plutonium oxide from a feed of plutonium metal for the Mixed Oxide (MOX) Fuel Fabrication Facility. The work presented here followed the general precipitation methods used at SRS to determine the quantity of solids present in the filtrate and to recommend an alternate filtration strategy. Initial Pu losses were found to be less than 1.5%. With additional filtration, this study indicates that a 50% further reduction in Pu solids in the filtrate can be achieved by the addition of a 2 μm filter.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.