17
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

On a finite production model with random defective rate and shortages allowed and backordered

&
Pages 695-699 | Received 01 Oct 2005, Published online: 18 Jun 2013
 

Abstract

Chiu and Chiu (2003) studied the problem of random defective rate on the Economic Production Quantity (EPQ) model with backorder permitted. They considered a random defective rate and all defective items assumed not repaired. In this note, we will offer a simple algebraic approach to replace his differential calculus skill to find the optimal production lot size and optimal maximal backorder level allowed under the expected annual cost minimized.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.