67
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Using simple methods to derive EOQ and EPQ models with shortage and imperfect quality

, , &
Pages 1333-1340 | Received 01 Jan 2011, Published online: 18 Jun 2013
 

Abstract

Huang [ Journal of Statistics and Management Systems, Vol. 6 (2003), No. 2, pp. 171– 180 ] studied the EOQ (Economic Order Quantity) and EPQ (Economic Production Quantity) models with backlogging and defective items using the algebraic approach. He assumed 100% inspection policy and the known proportion of defective items was removed prior to storage or use after the screening process. In this paper, we will off er both basic inequalities, arithmetic-geometric mean inequality (AGM) and Cauchy-Bunyakovsky-Schwarz inequality (CBS), to derive both the optimal lot size and backorder level under the total relevant cost per unit time minimized. Without the method of completing perfect square, the proposed methods derive the global minimum of the total relevant cost per unit time more easily than the algebraic approach used by Huang (2003)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.