A dual-criteria flow shop scheduling with sequence-dependent setup times

, &
Pages 485-500 | Received 01 Oct 2014, Published online: 02 Sep 2015
 

Abstract

Sequence-dependent setup time is the most complicated case of setup time of jobs on machines in shop scheduling. The operational cost of machines is related to the setup time required for preparation of jobs on machines. The objective is to minimize operational cost of machines subject to minimum total elapsed time of jobs for two stage flow shop problem. The setups on both the machines for jobs are considered to be sequence-dependent. The machines having different traits processing for different jobs are attached with probabilities. In addition to this, the problem also takes the effect of breakdown interval during the operation of jobs on total elapsed time and hence on the operational cost. To solve the problem an algorithm is proposed and a numerical example is given to substantiate the algorithm.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.