SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES

&
Pages 317-333 | Received 15 Jan 1994, Published online: 04 Sep 2007
 

Abstract

Existing dynamic programming formulations are utilized for the scheduling of serial linear projects. These formulations cannot, however, be used for the scheduling of nonserial linear projects. The intent of this paper is to present a nonserial dynamic programming formulation for the scheduling of linear projects with multiple non-overlapped loop structures. The objective of the nonserial dynamic programming solution is to provide for the selection of resources, interruptions, and lags for production activities that lead to the minimum project duration. The advantages of this nonserial dynamic programming approach include its ability to handle work interruption and variable production rates. In addition, the developed system produces a graphical representation of the project schedule of minimum duration. A nonserial linear project is treated herein using the proposed method.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.