341
Views
18
CrossRef citations to date
0
Altmetric
Original Articles

Optimizing water supply and hydropower reservoir operation rule curves: An imperialist competitive algorithm approach

, &
Pages 1208-1225 | Received 19 Oct 2013, Accepted 01 Aug 2014, Published online: 03 Oct 2014
 

Abstract

Efficient reservoir management requires the implementation of generalized optimal operating policies that manage storage volumes and releases while optimizing a single objective or multiple objectives. Reservoir operating rules stipulate the actions that should be taken under the current state of the system. This study develops a set of piecewise linear operating rule curves for water supply and hydropower reservoirs, employing an imperialist competitive algorithm in a parameterization–simulation–optimization approach. The adaptive penalty method is used for constraint handling and proved to work efficiently in the proposed scheme. Its performance is tested deriving an operation rule for the Dez reservoir in Iran. The proposed modelling scheme converged to near-optimal solutions efficiently in the case examples. It was shown that the proposed optimum piecewise linear rule may perform quite well in reservoir operation optimization as the operating period extends from very short to fairly long periods.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.