162
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

A Process Monitoring Scheme Controlling False Discovery Rate

&
Pages 1912-1920 | Received 11 Nov 2010, Accepted 16 Sep 2011, Published online: 13 Jun 2012
 

Abstract

A new process monitoring scheme is proposed by using the Storey procedure for controlling the positive false discovery rate in multiple testing. For the 2-span control scheme, it is shown numerically that the proposed method performs better than X-bar chart in terms of the average run length. Some simulations are accomplished to evaluate the performance of the proposed scheme in terms of the average run length and the conditional expected delay. The results are compared with those of the existing monitoring schemes including the X-bar chart. The false discovery rate is also estimated and compared with the target control level.

2000 Mathematics Subject Classification:

Notes

*The value in the column of X-bar chart is the Type I error, α.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.