57
Views
75
CrossRef citations to date
0
Altmetric
Original Articles

Shewhart x-charts with estimated process variance

, &
Pages 1797-1822 | Received 01 Sep 1980, Published online: 27 Jun 2007
 

Abstract

Properties of the Shewhart X-chart for controlling the mean of a process with a normal distribution are investigated for the situation where the process variance Ó2must be estimated from initial sample data. The control limits of the X-chart depend on the estimate of Ó2and thus, unlike the case when Ó2is known, the X-chart is not equivalent to a sequence of independent tests. When Ó2is estimated the distribution of the run length is not geometric and cannot be characterized simply in terms of the probability of a signal at a given point. The average run length (ARL) for the X-chart is expressed in terms of an integral involving the normal cdf, and it is shown that the chart signals with

probability one, but the ARL may not be finite if the size of the 2 sample used to estimate Ó2is sufficiently small. In addition, certain bounds for the ARL are also derived. Numerical integration is use to show that the effect of using small sample sizes in estimating Ó2is to increase the ARL and the variance of the run length distribution

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.