13
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Optimal Production Strategies for Plants with Multiple Shutdown Levels and Multiple Production Lines

&
Pages 46-53 | Received 01 Jun 1981, Published online: 06 Jul 2007
 

Abstract

When demand is less than plant capacity, aggregate production and demand can be matched by (1) throttling production at a rate equal to demand or (2) producing at capacity production rates and shutting down periodically to reduce inventories. In some plants several levels of shutdown are feasible. For example, a first level of shutdown may involve only equipment, while a second level of shutdown may involve shutting down equipment and laying off workers. Moreover, when a plant has multiple production lines, each line can be throttled or periodically shut down. This paper uses classical optimization techniques to develop optimal production strategies for plants with multiple shutdown levels and multiple, identical production lines.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.