Abstract
This paper addresses the problem of lot sizing within an acyclic hierarchical multiperiod production system. Cost conditions are established for the existence of optimal schedules satisfying the Wagner-Whit in property and a generalized nested schedules property. The method of proof is constructive and based on a network model. Imbedded in the proof are algorithms for adjusting any solution so that it satisfies the properties; thus the algorithms can be used to obtain a locally optimum solution from any trial schedule.