29
Views
3
CrossRef citations to date
0
Altmetric
TECHNICAL NOTE

Single operation earliness—tardiness scheduling with machine activation costs

&
Pages 509-513 | Received 01 Mar 2000, Accepted 01 May 2001, Published online: 17 Apr 2007
 

Abstract

We consider a static, single operation, non-pre-emptive, deterministic scheduling problem in which a set of n jobs is to be processed on k identical machines. Jobs assigned to each machine have a common due date. The number of machines (k) is unknown. Activating a machine will require additional costs to be incurred. The objective is to find an optimal sequence, the optimal number of machines (k), and the respective due dates to minimize the weighted sum of earliness, tardiness, and machine activation costs. We propose a polynomial time algorithm to solve the problem.

Additional information

Notes on contributors

SURYA D. LIMAN

Corresponding author

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.