61
Views
16
CrossRef citations to date
0
Altmetric
Original Articles

Optimal allocation of inspection effort over a finite planning horizon

&
Pages 515-527 | Received 01 Sep 1998, Accepted 01 Mar 2001, Published online: 17 Apr 2007
 

Abstract

We address the problem of managing the intensity, sequence and timing of inspection effort in an N-stage production system with M inspection activities possible at each stage. The objective is to minimize the sum of the inspection costs and the penalties caused by undetected defects. By means of the maximum principle we prove several properties or the optimal solution, which allow us to reduce the continuous-time inspection effort allocation problem to a combinatorial one. We suggest an efficient algorithm that solves the problem in 0(NM2 + N2) time.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.