72
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

A decomposition method for multi-product kanban systems with setup times and lost sales

&
Pages 613-625 | Received 01 Mar 2001, Accepted 01 Sep 2001, Published online: 02 May 2007
 

Abstract

We consider kanban controlled production systems with three or more different products processed on a single manufacturing facility. Customers for a product arrive according to a Poisson process. If a customer's demand cannot be met from stock, the customer leaves and satisfies his demand elsewhere (lost sales). Between the production of different products setup changes must be performed that take a significant time. Setup times and processing times are product-specific and follow exponential distributions. A production run continues until the target inventory level given by the number of kanbans for the product has been reached (exhaustive processing). Then the manufacturing facility is set up for the next product according to a fixed setup cycle. The exact model is mathematically intractable even for smaller systems. Therefore, we propose a decomposition-based approximation method for estimating steady-state performance measures

Additional information

Notes on contributors

GEORG N. KRIEG

E-mail: [email protected]

HEINRICH KUHN

E-mail: [email protected]

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.