Satisfying due-dates in large multi-factory supply chains

, , , &
Pages 803-811 | Received 01 Oct 2000, Accepted 01 Dec 2001, Published online: 17 Apr 2007
 

Abstract

A procedure is developed for the simultaneous scheduling of multi-factory supply chains, including inter-factory transportation. A job-shop scheduling procedure, known to provide near-optimal solutions to industrial-sized problems, is enhanced to include transportation elements in the fundamental model. In order to demonstrate the quality of the solutions, a lower bound calculation is compared to the procedure's solutions on a number of large-scale test problems. The lower bound is an enhancement of the classic lower bound calculation for the N-job, M-machine job shop. The computational effort in scheduling is linear in the size of the problem, and high quality solutions to large-scale problems can be obtained in seconds.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.