An Analysis of Scheduling Policies In Multiechelon Production Systems

&
Pages 370-377 | Received 01 Apr 1984, Published online: 09 Jul 2007
 

Abstract

Results of a simulation study of the economics of frequency of rescheduling Material Requirements Planning (MRP) systems are presented for a single-product, two-stage system in which demand is uncertain. The results indicate that for systems with moderate demand uncertainty, frequent rescheduling to maintain customer service may be uneconomical when compared with the alternative of more stable schedules in conjunction with safety stock. This result arises primarily because the cost of “emergency” production setups which occur when rescheduling is frequent exceeds the cost of safety stock required to “protect” stable schedules.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.