577
Views
6
CrossRef citations to date
0
Altmetric
Articles

The Tigris hydropower system operations: the need for an integrated approach

&
Pages 110-125 | Received 24 Mar 2017, Accepted 12 Aug 2017, Published online: 11 Oct 2017
 

Abstract

The Tigris hydropower system is analyzed through an integrated operational policy. The operation algorithm is formulated in terms of non-linear programming to maximize energy production while satisfying water demands in the basin. The system is optimized for different cases, and the effects of system modifications in terms of the reservoir volume of Ilisu Dam and the demand constraints are examined. In addition, the state of the Garzan subsystem is analyzed to explore plant utilization when optimizing the entire system operations. The results show the necessity of such an integrated operation plan to supply water demands in the basin.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.