1,866
Views
124
CrossRef citations to date
0
Altmetric
Original Articles

Phase I Statistical Process Control Charts: An Overview and Some Results

, &
Pages 52-62 | Published online: 05 Dec 2008
 

ABSTRACT

In practice, Phase I analysis constitutes an integral part of an overall SPC program in which control charts play a crucial role. An overview of the literature on Phase I parametric control charts for univariate variables data is presented. Since the Phase I signaling events are dependent and multiple signaling events are to be dealt with simultaneously in making an in-control or out-of-control decision, the joint distribution of the charting statistics is used to control the false alarm probability, which is defined as the probability of at least one false alarm, while designing the charts. An example is given. Concluding remarks include suggestions regarding future research problems.

ACKNOWLEDGEMENTS

We thank the referees and the editor for their constructive comments and suggestions. The second and third authors would also like to thank the Department of Statistics and STATOMET of the University of Pretoria for support.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.