103
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling multi-operation jobs in partially overlapping systems

, &
Pages 453-462 | Published online: 19 Feb 2007
 

Abstract

This paper deals with the important and difficult scheduling problem of flexible manufacturing systems (FMS) with multi-operation parts and machines with partially overlapping capabilities. The scheduling problem of partially overlapping systems is shown to be a general form of many classical scheduling problem models and can be applied to several application domains such as distributed computing systems, machinery systems and/or robots. The quality of a schedule in this paper is measured by the minimization of part transfers and the makespan. Our approach adopts a divide-and-conquer strategy. First the problem is separated into three sub-problems based on the characteristics of the model. Then, implicit enumeration and heuristics algorithms are developed for the sub-problems. Experimental results show that the proposed solutions perform ‘well’ for a set of open shop benchmark problems and practically solve the partially overlapping scheduling problems at various sizes.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.