195
Views
11
CrossRef citations to date
0
Altmetric
Articles

Simulation-based scheduling of assembly operations

&
Pages 325-333 | Received 18 Dec 2007, Accepted 22 Mar 2008, Published online: 06 Apr 2009
 

Abstract

The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates how Timed AND/OR-graphs can be modelled with a common discrete event simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimise the workflow of the assembly systems.

Acknowledgement

The research is funded by the German Federal Ministry of Education and Research.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.