13
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Periodic pull: a modified approach to Just-In-Time production

, &
Pages 186-190 | Published online: 30 Mar 2007
 

Abstract

The Just-In-Time (JIT) production method has captured wide attention as the inherent goal of drastically reducing work-in-process inventory addresses, a serious problem that has perpetually plagued batch production systems. The implementation of the conventional JIT method can only be successful if equipment, procedures and manpower are well honed and work in good co-ordination and co-operation. The margin for error is very fine and any weakness in the system leads to heavy disruption of the system as a whole. This paper examines an alternative approach where jobs are periodically pulled at prescribed intervals. Results showed that with a good scheduling rule such as SPT/LATE the system performance only falls slightly when the production period is increased to six times the mean job process time.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.