Publication Cover
Production Planning & Control
The Management of Operations
Volume 5, 1994 - Issue 3
15
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Measures of backtracking and bi-directional flow in one dimensional machine location problems

, &
Pages 282-291 | Published online: 19 Apr 2007
 

Abstract

In many modern manufacturing settings, management simplifies the workflow of jobs to the greatest extent possible by avoiding a job-shop structure in favour of a generalized flow line (GFL) in which all jobs flow in a single direction (Conway et al., 1967, Theory of Scheduling (Addison-Wcsley)). Heuristics may be used to assign machines to appropriate locations in the attempt to achieve a GFL. Materials that must be transported upstream in a production line are said to ‘backtrack’. Since no backtracking occurs in a GFL, the relative amount of backtracking that does occur is an indication of the degree to which the ideal (and most productive) case is achieved. Several measures of the backtracking of materials are developed in this paper to assess the degree to which a configuration approaches the GFL. The measure for backtracking is extended to bi-directional flow problems which may occur when a GFL is not achievable because of the job routing.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.