Publication Cover
Production Planning & Control
The Management of Operations
Volume 5, 1994 - Issue 3
16
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Optimizing lot size and setup time in a JIT environment: a multiple objective application

, &
Pages 308-319 | Published online: 19 Apr 2007
 

Abstract

The just-in-time (JIT) system has been studied extensively and implemented by a number of US firms as an ell'ective production system. The core of JIT involves determination of lot size and setup time reduction so as to increase manufacturing flexibility while minimizing the inventory level. This decision problem usually involves multiple conflicting objectives and mixed-model production. In this paper, goal programming (GP) is applied to a real-world JIT problem involving fabrication of different automotive and industrial rubber composite belts. The model results provide new insights concerning the conflicting nature of several goals, especially between meeting demand and reducing setup or idle time. Also, the GP solution is superior to the current JIT practice of the company.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.