Publication Cover
Production Planning & Control
The Management of Operations
Volume 7, 1996 - Issue 2
26
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Production lot sizing model with insufficient production capacity

&
Pages 222-224 | Published online: 27 Apr 2007
 

Abstract

A mathematical model is developed for determining the optimal number of batches for the production lot sizing problem where the production capacity is lower than the annual demand requirement. Setup time is included and it is assumed that consumption begins only after the entire batch is produced. The model is illustrated through an example.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.