Minimizing the mean squared deviation from a common due date: unconstrained and constrained cases

&
Pages 492-502 | Published online: 27 Apr 2007
 

Abstract

The problem of minimizing the mean squared deviation (MSD) of completion times from a common due date in both unconstrained and constrained cases is addressed. It is shown that the unconstrained MDS function is unimodal for n ≤ 6, where n is the number of jobs. The constrained case is shown to be unimodular for n ≤ 3, The unconstrained case is shown, by counterexample, not to be unimodular for n = 8. The constrained case is shown not to be unimodular for n = 5. For the unimodular cases, a proposed search routine can find the optimum solution in less than three CPU seconds for n = 100. It provides an excellent heuristic solution otherwise. Computational results are shown in both cases.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.