This paper is a report of a simulation study that investigates a dynamic approach to scheduling jobs in a hybrid assembly/job shop, with special application to welding shop operations. Both JIT arrival and JIT delivery are considered. Various dispatching rules with different utilization are tested for the following performance measures; mean flow time, percentage of tardy jobs, mean tardiness, sum of mean tardiness and mean earliness. The results indicate that the SPT rule is the best for the mean flow time. The MSLACK rule, that we suggest in this paper, is the best for mean tardiness, the sum of mean tardiness and mean earliness. However, it is not clear which rule is the best for the percentage of tardy jobs. We also investigate the effect of changing the release time on the performance measure.
A simulation study for dynamic scheduling in a hybrid assembly/job shop considering the JIT context
Reprints and Corporate Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
To request a reprint or corporate permissions for this article, please click on the relevant link below:
Academic Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
Obtain permissions instantly via Rightslink by clicking on the button below:
If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.
Related research
People also read lists articles that other readers of this article have read.
Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.
Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.