16
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Integrated inspection strategy model with inspection errors and positive inspection time lengths

Pages 335-348 | Received 01 Nov 2003, Published online: 14 Jun 2013
 

Abstract

This paper extends an integrated model of production maintenance and quality to consider the possibilities of inspection errors and allow positive time lengths for inspection. These generalizations are important because in many situations checking demands a considerable amount of time and there may be inspection errors due to human or technological limitations. We derive the optimal solutions for the durations of the first inspection interval, the number of inspections, the economic production quantity (EPQ) and the preventive maintenance (PM) level. Numerical analyses are performed to illustrate important aspects of the developed model.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.