Reinforcement design optimisation for continuously reinforced concrete pavement: one-mat vs. two-mat

, &
Article: 2273325 | Received 09 Jun 2022, Accepted 16 Oct 2023, Published online: 27 Nov 2023
 

ABSTRACT

Over the years, thicknesses of continuously reinforced concrete pavement (CRCP) increased to accommodate rising truck traffic. With a fixed percentage of longitudinal reinforcement relative to the concrete cross-sectional area, thicker slabs necessitate more reinforcement and reduced bar spacing, potentially hindering consolidation. To address this issue, two-mat steel design was implemented in Texas for pavements with thickness of 330 mm (13 in.) or larger. Performance evaluations of thick CRCPs revealed that horizontal cracking developed at the depth of reinforcement where one-mat steel was placed, while no horizontal cracking was observed where two-mat steel was used. Pavement responses with one-mat and two-mat reinforcements with different depths were analysed by three-dimensional modelling with a finite element analysis (FEA) programme for the wide range of environmental loadings. Maximum concrete vertical tensile stresses around longitudinal reinforcement at transverse crack area are a good indicator of horizontal cracking potential; those stresses were evaluated, along with concrete stresses at top of the slab, which are responsible for top-down transverse cracking. The results show that the two-mat design causes higher concrete stresses at the top of the concrete slab and lower concrete stresses around the longitudinal reinforcement, leading to increased transverse cracks and a reduction in horizontal cracking potential.

Acknowledgment

This research study was sponsored by the Texas Department of Transportation in cooperation with the Federal Highway Administration with the project number 20-168 (0-7026) (Lee et al. Citation2023).

Disclosure statement

No potential conflict of interest was reported by the author(s).

Additional information

Funding

This work was supported by Texas Department of Transportation.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.