1990 Thermal Remediation Industry Contractor Survey

&
Pages 1178-1182 | Received 23 Feb 1990, Accepted 14 May 1990, Published online: 06 Mar 2012
 

Abstract

The treatment of soil contaminated with organics and inorganics is becoming a major industry in the United States and Europe. The soil cleanup bill for the United States could run as high as $200 to $300 billion over the next 30 to 40 years. European soil cleanup costs could run as high as $130 billion.1

The types of sites in the United States that will require soil treatment can be broken down into the following categories:

CERCLA (Superfund) Actions

RCRA Corrective Actions

RCRA Closures

Underground Storage Tanks

Real Estate Transfers

Spill Clean-ups.

The cleanup of sites in each of these categories, with the exception of the Real Estate Transfer category, is being driven by different sets of Federal regulations. Real Estate Transfer type regulations were first instituted in New Jersey and have now been promulgated in a number of other states.

The eventual cleanup cost for the Superfund sites will be close to $200 billion. Estimated costs for the industrial sector Superfund are $25 to $50 billion and the estimated cost for the Department of Energy sites is over $150 billion.2 An early RCRA Corrective Action cleanup estimate is $25 billion.3 This estimate may well be low, however, since the permitting, cleanup and delisting criteria are still not clearly defined. The EPA’s RCRA Corrective Action cost estimate is $7.4 billion. However, the Office of Management and Budget feels that this estimate is low.4

The potential magnitude of the cleanup costs has resulted in the development and implementation of many technologies for the decontamination of soils. Of the available remedial technologies, thermal treatment has perhaps had the most field testing. The purpose of this paper is to focus on the full scale site remediations which have been or are being conducted using thermal processing equipment. Projects which have been completed, are on-going, or have been contracted for, through January of 1990 are described.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.