Abstract
The University of Houston is located just south of downtown Houston, TX. Many different chemical substances are used in scientific research and teaching activities throughout the campus. These activities generate a significant amount of waste materials that must be discarded as regulated hazardous waste per U.S. Environmental Protection Agency (EPA) rules. The Texas Commission on Environmental Quality (TCEQ) is the state regulatory agency that has enforcement authority for EPA hazardous waste rules in Texas. Currently, the University is classified as a large quantity generator and generates >1000 kg per month of hazardous waste. In addition, the University has experienced a major surge in research activities during the past several years, and overall the quantity of the hazardous waste generated has increased. The TCEQ requires large quantity generators to prepare a 5-yr Pollution Prevention (P2) Plan, which describes efforts to eliminate or minimize the amount of hazardous waste generated. This paper addresses the design and development of a low-cost P2 plan with minimal implementation obstacles and strong payoff potentials for the University. The projects identified can be implemented with existing University staff resources. This benefits the University by enhancing its environmental compliance efforts, and the disposal cost savings can be used for other purposes. Other educational institutions may benefit by undertaking a similar process.