27
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Integration of a Multi-Stage Bulk Materials Acquisition System from the Viewpoint of Dock Operations

Pages 207-219 | Received 16 Oct 2000, Accepted 01 May 2001, Published online: 31 Oct 2008
 

Abstract

A multi-stage bulk materials acquisition system is examined from the viewpoint of dock operations. The whole process can be divided into four stages and treated as four subsystems: ships scheduling planning, material yard planning, dock arrangement, and material discharging. Since the structure and the complexity of each subsystem is different, the solution approaches applied are also different with respect to each. To increase operations efficiency and data consistency, an integration of the subsystems by coordinating the operations sequence and data communications for the four subsystems is discussed. The four subsystems are illustrated by using the material docks of China Steel Corporation, and the models developed in this research are also validated. The results indicate that the models developed are capable of deriving solutions better than the existing ones. Although the discussions are confined to China Steel Corporation, the models can be applied to other companies with similar operations.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.