38
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Dynamic model of secondary process of urban wastewater treatment plants

Pages 2057-2068 | Received 20 Feb 1997, Accepted 31 Mar 1997, Published online: 15 Dec 2008
 

Summary

This paper presents the methodology for obtaining equations which describe the secondary treatment of urban wastewater treatment plants.

The kinetics of the biodegradation reaction are shown, and a proposal is made to include the sludge age in the specific growth rate, in order to generalize from the classic process of activated sludge to that of extended aeration.

The application of a mass balance to the aerobic reactor is shown, in order to obtain equations which describe its behavior.

We will introduce a working hypothesis of the sludge settling mechanism to determine volumes of the clarification and sedimentation zones of the final clarifier, in order to obtain equations describing it.

A graphic demonstration is provided with the results of activated sludge process simulation using the mathematical model presented here.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.