158
Views
3
CrossRef citations to date
0
Altmetric
Articles

Estimating freeway route travel time reliability from data on component links and associated cost implications

ORCID Icon, , , ORCID Icon &
Pages 414-430 | Received 23 May 2017, Accepted 29 Oct 2017, Published online: 16 Nov 2017
 

ABSTRACT

Typically, data on travel time (speed) and traffic volume are collected for relatively short homogenous links of a roadway (e.g. every ½ to 2 miles or 0.8–3.2 km) and not for particular routes from origins to destinations. To accurately estimate a traveller’s trip, there is a need to build information on an entire route from data collected at the link level. Because it can be resource-intensive to define specific routes for the entire network of interest, route reliability performance measures are sometimes estimated using a vehicle-miles of travel (VMT)-weighted average of performance indices from links.

In performance measurement, travel time index (TTI) is the ratio of average travel time and free-flow travel time while planning time index (PTI) is the ratio of 95th percentile travel time and free-flow travel time. TTI is considered a mobility measure while PTI reflects system reliability. Using indices based on free-flow (uncongested) travel time, this study finds that the VMT-weighting of link indices to get the corresponding route index gives reasonable results for the travel time index (TTI). However, this approach overestimates the planning time index (PTI). This highlights the statistical insufficiency of estimating route PTI values from link PTI values weighted by VMT. It points to the subsequent need to incorporate factors for dispersion and skewness characteristics of travel time distributions on constituent links. This paper introduces a promising method to estimate freeway route reliability considering these dispersion and skewness properties.

For statewide Virginia Interstates considered here, economic analyses based on the value of travel time demonstrate that incorrect travel time reliability estimates result in upwards of 200% higher user costs. Researchers anticipate that the information documented in this paper will be useful for those conducting performance monitoring activities to estimate route reliability with limited resources when only link data are available.

Acknowledgements

The authors would like to thank VDOT for providing the data used for this study.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

The authors would like to thank the sponsors of the Mobility Measurement in Urban Transportation (MMUT) Federal Highway Administration (FHWA) pooled fund study, which sponsored this study. The MMUT study is a pooled fund study in partnership with FHWA. This study is sponsored by 13 state DOTs and a few MPOs including HGAC. In this respect, the current text regarding funding summarizes the sponsorship for this research adequately.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.