ABSTRACT
Current industrial trends favor distributed manufacturing with extensive use of subcontracting. In this context we present a two—level decision support system for operations scheduling where a set of firms (subcontractors) is competing for the realization of the manufacturing operations pertaining to a product. We consider the case where operation precedences are given in form of an assembly tree. Each firm bidding for an operation specifies a start time, a processing time, a production cost together with a storage cost for storing the work-in-process resulting from that operation beyond its completion time. At the first level, IBIS, an information support system is used for bid preparation based on resource usage, production requirements and production operations costs. At the second level, given the bids we present a procedure for finding the assignment of operations to firms that minimizes production and storage costs.
RÉSUMÉ
La tendance actuelle favorise la fabrication répartie et la sous-contractance. Dans ce contexte, nous présentons un système à deux niveaux pour l'ordonnancement des tâches dans lequel un ensemble d'entreprises (les sous-contractants) sont en concurrence pour la réalisation des tâches menant aux produits. Nous considérons le cas où les contraintes de précé- dences sont données sous forme d'arbres d'assemblage. Chaque firme candidate pour une tâche donne le temps de début, le temps de fabrication, les coûts de production et de stockage des en—cours résultant de ces opérations. Au premier niveau, IBIS, un système d'information est utilisé pour la préparation des propositions de travail, il prend en compte l'utilisation des ressources, les besoins de production et les coûts de fabrication. Au deuxième niveau, étant donné les propositions, nous proposons une procédure pour trouver les affectations des tâches aux entreprises qui minimisent les coûts de production et de stockage.