440
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Effectiveness of Pile Reinforcement in Liquefied Ground

, &
Pages 1222-1244 | Received 17 May 2017, Accepted 20 Mar 2018, Published online: 19 Apr 2018
 

ABSTRACT

Installing reinforcement piles is an effective method to mitigate ground movement in liquefied soils. In this study, the effectiveness of the pile-reinforcement method is evaluated using an advanced finite element program OpenSeesPL. Parametric studies are conducted to investigate key parameters in the mitigation model, including pile area replacement ratio, pile diameters and pile-embedment length. The effectiveness of pile reinforcement to reduce large flow deformation in the liquefied ground is significantly influenced by the pile-embedment condition. It is recommended the embedment length is at least 1 m or 2 m if the underlying soil is a dense or a medium sand.

Additional information

Funding

This work was supported by the Hong Kong Research Grants Council [Grant Nos. 16213615, T22-603/15N] and the National Natural Science Foundation of China [Grant No. 51639006], which are greatfully acknowledged.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.