207
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

A comparison of open pit design and scheduling techniques

&
Pages 53-61 | Published online: 10 May 2007
 

ABSTRACT

Two competing software packages are commercially available for open pit production scheduling: Whittle Four-X and Earthworks NPVScheduler. In this study NPVScheduler was benchmarked against the Four-X using a statistically designed experiment for accuracy, optimality and technical practicality. The ultimate pits generated by both packages were found to be essentially the same in value, size and shape. The optimal pits generated by NPVScheduler tended to be smaller in size but similar in value to those generated by Four-X.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.