333
Views
40
CrossRef citations to date
0
Altmetric
Original Articles

Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability

&
Pages 85-98 | Published online: 02 Feb 2010
 

Abstract

Mixed integer programming (MIP) has become a common approach for optimizing production schedules of open pit mines since the 1960s. However, MIP has been found to be limited by: (a) feasibility in generating optimal solutions with practical mining schedules; and (b) inability to deal with in-situ variability of orebodies. In looking into these shortcomings, this paper presents a general production scheduling method for multi-element deposits in open pit mines. The method is subsequently used to optimize the production schedule in a nickel laterite deposit. The application confirms the weaknesses of MIP formulations mentioned above. An alternative MIP formulation is then presented and applied to the same deposit. The results of the new formulations show that the new MIP model can overcome the above shortcomings and generate practical mining schedules with a higher chance of achieving planned production targets than traditional MIP schedules.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.