92
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Financially Efficient Dig-Line Delineation Incorporating Equipment Constraints and Grade Uncertainty

&
Pages 99-121 | Published online: 02 Feb 2010
 

Abstract

Greedy local search heuristics that provide estimates of financially efficient dig-lines are proposed. To generate alternate dig-lines these heuristics employ a floating circle-based perturbation mechanism that ensures that mining equipment constraints are satisfied. Distributions of financial payoffs for alternate dig-lines are constructed from multiple conditional simulations, then evaluated using a mean-downside risk efficiency model. Computational results show that equipment constraints significantly increase the financial risk for a given expected payoff and that the heuristic efficient frontier is sensitive to the mining strategy. For the problem instances that we examined we observed that mining waste material at transitions prior to mining ore material: minimised the upfront operating costs; maximised the profit for a given level of financial risk; and freed milling capacity.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.