Using electrical resistance to evaluate the chip seal curing process

, &
Pages 98-111 | Received 15 Aug 2016, Accepted 25 Oct 2016, Published online: 23 Oct 2017
 

Abstract

Chip seals are among the most cost-effective surface treatments available for pavement preventive maintenance. However, frequent issues associated with asphalt emulsion early mechanical strength development, resulting in premature surface treatment failure, have led to the need to improve the characterisation of the chip seal curing process. As such, the use of an electrical resistance measurement has been studied to develop a sound construction methodology that prevents common failures that occur soon after construction. This paper presents a novel approach, based on electrical resistance measurements, to determine when a chip seal has developed enough binder adhesive strength to bond to the existing pavement while keeping the aggregate chips in place. The electrical resistance measurements provide a rapid, non-destructive indication of the amount of curing that has occurred. By implementing this methodology the user can determine when a chip seal has gained sufficient mechanical strength to allow for brooming or opening to unrestricted traffic without an undue loss of cover aggregate. Laboratory and full-scale field trials were conducted using a variety of materials. The electrical properties of the fresh seal coats were quantified by employing a handheld electrical device with a two-point probe resistance measurement. The experimental results suggest that chip seal systems have gained significant mechanical strength when the initial electrical resistance measurement increases by a factor of 10. As a result, this study establishes that electrical resistance measurements can be used to determine when a fresh chip seal has sufficiently cured to withstand the shear forces of brooms and uncontrolled traffic. The implementation of the technique could potentially impact chip seal construction quality, as well as service life performance.

Acknowledgements

The contents of this paper reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the sponsors. These contents do not constitute a standard, specification, or regulation.

Disclosure statement

No potential conflict of interest was reported by the authors.

Additional information

Funding

This research work was supported by the Indiana Department of Transportation (INDOT) and Joint Transportation Research Program (JTRP) [grant number SPR-3801].

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.